Submit a request
Sign in
  1. Trus Joist Technical Support
  2. Software
  3. Javelin Frequently Asked Questions

Why does commercial loading take so long to calculate in Javelin®?

Follow

       A: Commercial requires more load combinations and therefore takes longer to design. With more complicated jobs the design time goes up exponentially. For best practices please reference the flowing link: JET-14002 Performance Considerations for Large Javelin Jobs

  • Facebook
  • Twitter
  • LinkedIn
Was this article helpful? 0 out of 0 found this helpful

Have more questions?

Submit a request
Return to top

Comments

0 comments

Please sign in to leave a comment.

Articles in this section

  • I'm having trouble selecting an object on the drawing screen?
  • Why aren’t hangers specified for a Parallam Plus to TimberStrand connection?
  • I have the Javelin® application on my desktop machine at work but want to load it on a laptop. Can I do that?
  • What is SQL server and why do I keep getting a message that the Javelin® application cannot log into it?
  • Is Javelin Free and can I get a trial use license?
  • Why are some hangers listed twice in the Javelin® consider list?
  • Customer was missing a TJI on the Javelin® material list ...why?
  • What if I want to see my connector name right on my Javelin® drawing?
  • My Javelin® layout sheets look good in the program, but when I open the PDF they do not?
  • How do I exclude dimension lumber hangers from a Javelin® material list?
See more

Can’t find what you’re looking for?

Submit a request
  • Weyerhaeuser Home
  • Timberlands
  • Recreation
  • Land
  • Wood Products
  • Energy
  • Sustainability
  • Investors
  • Careers
  • Company
  • Weyerhaeuser Japan
  • Submit Ideas and Inventions
  • Privacy Policy
  • Legal Notices
© 2019 Weyerhaeuser Company. All Rights Reserved.